Sign In | Join Free | My gastesters.com
China Jiangsu Zhonghai Bridge Equipment Co.,LTD logo
Jiangsu Zhonghai Bridge Equipment Co.,LTD
Jiangsu Zhonghai Bridge Equipment Co.,LTD
Verified Supplier

1 Years

Home > Bailey Bridge >

Temporary Truss Railway Steel Bridge / Steel Train Bridge Q355B

Jiangsu Zhonghai Bridge Equipment Co.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Temporary Truss Railway Steel Bridge / Steel Train Bridge Q355B

Brand Name : Zhonghai Bailey Bridge

Model Number : CB200/CB321

Certification : IS09001, CE

Place of Origin : China

MOQ : 1 Pcs

Price : USD 95-450

Payment Terms : L/C,D/P,T/T

Supply Ability : 60000ton/year

Delivery Time : 8-10 work days

Packaging Details : Naked

Cost : Affordable

OEM : Specialized

Type : Truss bridge

Material : Steel

Application : Temporary Bridge

Main Steel : Q345B

Structure Type : Steel Truss Bridge

Corrosion Prevention : Galvanization Or Painting

Product Capability : 60000 Pieces Per Year

Standard : ASTM,GB,BS,BV

Grade : Q355B

Contact Now

Steel Truss Bridge/railway Steel Bridge For Sale


At Jiangsu Zhonghai Bridge Equipment Co., Ltd., we adhere strictly to the quality policy of "Quality First, Customer Supreme." We believe that the foundation of our success lies in the unwavering commitment to providing products of the highest quality and delivering exceptional customer service. Every step of our production process, from raw material selection to final product inspection, is meticulously managed to ensure that our bridges and equipment meet the most rigorous international standards. Our dedication to customer satisfaction drives us to continuously improve our products and services, and to respond promptly to customer needs. By prioritizing quality and customer focus, we aim to build enduring trust and long-term partnerships with our clients.


Specifications:

CB321(100) Truss Press Limited Table
No. Lnternal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Standard Truss Moment(kN.m) 788.2 1576.4 2246.4 3265.4 1687.5 3375 4809.4 6750
321(100) Standard Truss Shear (kN) 245.2 490.5 698.9 490.5 245.2 490.5 698.9 490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No. Geometric Characteristics Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Section properties(cm3) 3578.5 7157.1 10735.6 14817.9 7699.1 15398.3 23097.4 30641.7
321(100) Moment of inertia(cm4) 250497.2 500994.4 751491.6 2148588.8 577434.4 1154868.8 1732303.2 4596255.2
Temporary Truss Railway Steel Bridge / Steel Train Bridge Q355BTemporary Truss Railway Steel Bridge / Steel Train Bridge Q355BTemporary Truss Railway Steel Bridge / Steel Train Bridge Q355BTemporary Truss Railway Steel Bridge / Steel Train Bridge Q355B

​​

CB200 Truss Press Limited Table
NO. Internal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS QS SSR DSR TSR QSR
200 Standard Truss Moment(kN.m) 1034.3 2027.2 2978.8 3930.3 2165.4 4244.2 6236.4 8228.6
200 Standard Truss Shear (kN) 222.1 435.3 639.6 843.9 222.1 435.3 639.6 843.9
201 High Bending Truss Moment(kN.m) 1593.2 3122.8 4585.5 6054.3 3335.8 6538.2 9607.1 12676.1
202 High Bending Truss Shear(kN) 348 696 1044 1392 348 696 1044 1392
203 Shear Force of Super High Shear Truss(kN) 509.8 999.2 1468.2 1937.2 509.8 999.2 1468.2 1937.2
Temporary Truss Railway Steel Bridge / Steel Train Bridge Q355BTemporary Truss Railway Steel Bridge / Steel Train Bridge Q355BTemporary Truss Railway Steel Bridge / Steel Train Bridge Q355BTemporary Truss Railway Steel Bridge / Steel Train Bridge Q355B

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
Structure Geometric Characteristics
Geometric Characteristics Chord Area(cm2) Section Properties(cm3) Moment of Inertia(cm4)
ss SS 25.48 5437 580174
SSR 50.96 10875 1160348
DS DS 50.96 10875 1160348
DSR1 76.44 16312 1740522
DSR2 101.92 21750 2320696
TS TS 76.44 16312 1740522
TSR2 127.4 27185 2900870
TSR3 152.88 32625 3481044
QS QS 101.92 21750 2320696
QSR3 178.36 38059 4061218
QSR4 203.84 43500 4641392
Temporary Truss Railway Steel Bridge / Steel Train Bridge Q355BTemporary Truss Railway Steel Bridge / Steel Train Bridge Q355BTemporary Truss Railway Steel Bridge / Steel Train Bridge Q355BTemporary Truss Railway Steel Bridge / Steel Train Bridge Q355B


Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity



Temporary Truss Railway Steel Bridge / Steel Train Bridge Q355B


Product Tags:

temporary steel train bridge

      

temporary railway steel bridge

      

bs steel train bridge

      
China Temporary Truss Railway Steel Bridge / Steel Train Bridge Q355B wholesale

Temporary Truss Railway Steel Bridge / Steel Train Bridge Q355B Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jiangsu Zhonghai Bridge Equipment Co.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)