Sign In | Join Free | My gastesters.com
China Jiangsu Zhonghai Bridge Equipment Co.,LTD logo
Jiangsu Zhonghai Bridge Equipment Co.,LTD
Jiangsu Zhonghai Bridge Equipment Co.,LTD
Verified Supplier

1 Years

Home > Bailey Bridge >

New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m

Jiangsu Zhonghai Bridge Equipment Co.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m

Brand Name : Zhonghai Bailey Bridge

Model Number : CB200/CB321

Certification : IS09001, CE

Place of Origin : China

MOQ : 1 Pcs

Price : USD 95-450

Payment Terms : L/C,D/P,T/T

Supply Ability : 60000ton/year

Delivery Time : 8-10 work days

Packaging Details : Naked

Application : Bailey Bridge

Surface : Galvanized

Name : Bailey Bridge

Net Width : 3.15m,3.6m,4.2m,7.35m,10.5m

Material : Steel

Grade : Q345-Q460C

Lane : Single lane 3.15m~4.2m,Double Lane 7.35m

Surface Protection : hot-dip galvanized

Contact Now

New Type Bailey Bridge/with Factory Price Ce Bailey Bridge


When building a 321-type Bailey bridge in mountainous areas, it is crucial to ensure that the bridge base is stable. Here are some specific methods and precautions:


1. **Foundation bearing capacity inspection**
- **Soil condition assessment**: Before building a Bailey bridge, the soil conditions at the bridge base must be assessed to ensure that the soil is solid. If the soil bearing pressure does not meet the design requirements, the foundation under the bridge base must be expanded or reinforced.
- **Angle of repose pile setting**: When the bank slope is steep (greater than the angle of repose), the position of the angle of repose pile must be calculated and set according to the formula.


2. **Foundation reinforcement method**
- **Enlarge the foundation**: If the soil conditions are not good, the bearing capacity can be increased by expanding the foundation area.
- **Concrete reinforcement**: Pour the concrete foundation at the bridge base to ensure that the foundation is deep into the stable stratum and provides sufficient support.
- **Pile foundation reinforcement**: When necessary, the method of driving pile foundation can be used to enhance the stability of the foundation.


3. **Bridge seat design and construction**
- **Bridge seat axle beam**: The bridge end column is supported on the bridge seat axle beam, which is divided into multiple sections. The appropriate bridge seat is selected according to the number of bridge rows.
- **Seat plate setting**: The seat plate should be set at the seat plate axis position, and the seat plate position should be properly excavated to reduce the bridge deck elevation, generally making the height difference between the bridge deck and the road surface no more than 30 cm.


4. **Precautions during construction**
- **Construction personnel safety**: Construction personnel must wear safety helmets and safety belts, and it is strictly forbidden to work on the rack after drinking. When using a crane to lift and remove Bailey piers, a special person should be assigned to direct the crane, and it is strictly forbidden for the crane boom to collide with the Bailey beam and its foundation.
- **Roller setting**: Rollers are set at the marked roller position, and a sample plate should be placed underneath. Only one row of trusses is allowed to pass through each rock, and the distance between the rock and the bearing plate is about 1.0 meter, and at least not less than 0.75 meter.

Through the above measures, the stability of the bridge base foundation can be ensured when building a Type 321 Bailey bridge in mountainous areas, thereby ensuring the safety and stability of the bridge.



Specifications:

CB321(100) Truss Press Limited Table
No. Lnternal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Standard Truss Moment(kN.m) 788.2 1576.4 2246.4 3265.4 1687.5 3375 4809.4 6750
321(100) Standard Truss Shear (kN) 245.2 490.5 698.9 490.5 245.2 490.5 698.9 490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No. Geometric Characteristics Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Section properties(cm3) 3578.5 7157.1 10735.6 14817.9 7699.1 15398.3 23097.4 30641.7
321(100) Moment of inertia(cm4) 250497.2 500994.4 751491.6 2148588.8 577434.4 1154868.8 1732303.2 4596255.2
New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35mNew Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35mNew Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35mNew Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m

​​

CB200 Truss Press Limited Table
NO. Internal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS QS SSR DSR TSR QSR
200 Standard Truss Moment(kN.m) 1034.3 2027.2 2978.8 3930.3 2165.4 4244.2 6236.4 8228.6
200 Standard Truss Shear (kN) 222.1 435.3 639.6 843.9 222.1 435.3 639.6 843.9
201 High Bending Truss Moment(kN.m) 1593.2 3122.8 4585.5 6054.3 3335.8 6538.2 9607.1 12676.1
202 High Bending Truss Shear(kN) 348 696 1044 1392 348 696 1044 1392
203 Shear Force of Super High Shear Truss(kN) 509.8 999.2 1468.2 1937.2 509.8 999.2 1468.2 1937.2
New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35mNew Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35mNew Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35mNew Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
Structure Geometric Characteristics
Geometric Characteristics Chord Area(cm2) Section Properties(cm3) Moment of Inertia(cm4)
ss SS 25.48 5437 580174
SSR 50.96 10875 1160348
DS DS 50.96 10875 1160348
DSR1 76.44 16312 1740522
DSR2 101.92 21750 2320696
TS TS 76.44 16312 1740522
TSR2 127.4 27185 2900870
TSR3 152.88 32625 3481044
QS QS 101.92 21750 2320696
QSR3 178.36 38059 4061218
QSR4 203.84 43500 4641392
New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35mNew Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35mNew Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35mNew Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m



Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity


New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m


Product Tags:

new bailey bridge

      

new portable steel bridge

      

7.35m bailey bridge

      
China New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m wholesale

New Type Bailey Bridge With Factory Price Q345-Q460C Grade Double Lane 7.35m Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jiangsu Zhonghai Bridge Equipment Co.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)