Sign In | Join Free | My gastesters.com
China Jiangsu Zhonghai Bridge Equipment Co.,LTD logo
Jiangsu Zhonghai Bridge Equipment Co.,LTD
Jiangsu Zhonghai Bridge Equipment Co.,LTD
Verified Supplier

1 Years

Home > Bailey Bridge >

Q235 Bailey Suspension Bridge / Prefabricated Compact Bailey Bridge

Jiangsu Zhonghai Bridge Equipment Co.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Q235 Bailey Suspension Bridge / Prefabricated Compact Bailey Bridge

Brand Name : Zhonghai Bailey Bridge

Model Number : CB200/CB321

Certification : IS09001, CE

Place of Origin : China

MOQ : 1 Pcs

Price : USD 95-450

Payment Terms : L/C,D/P,T/T

Supply Ability : 60000ton/year

Delivery Time : 8-10 work days

Packaging Details : Naked

Application : Bailey Bridge

Surface : Galvanized

Name : Bailey Bridge

Used In Military And Civilian Applications : Yes

Net Width : 3.15m,3.6m,4.2m,7.35m,10.5m

Type : Truss Bridge

Secondary Steel : Q235

Modular Design : Yes

Material : Steel

Structure Type : Steel Bridge

Width : 4.2

Color : Green, Grey, Orange,Red

Contact Now

Suspension Bailey Bridge/prefabricated Compact Bailey Bridge


When reinforcing Bailey bridges in mountainous areas, construction safety is of vital importance. Here are some key safety considerations and measures:


1. **Preparation before construction**
- **Geological survey**: Before construction, a detailed survey of the geological conditions in the mountainous area should be conducted to ensure the rationality of the foundation treatment plan.
- **Special construction plan**: Prepare a special construction plan including design, assembly, dismantling, etc., and clarify safety measures.
- **Staff training**: All personnel involved in the construction must be qualified after training before they can take up their posts, and special operations personnel must be certified before taking up their posts.


2. **Foundation treatment**
- **Foundation bearing capacity inspection**: After the foundation is excavated, it should be checked whether the geology meets the design requirements, the concrete foundation should be poured in time, and drainage facilities should be well prepared to avoid rainwater soaking.
- **Foundation reinforcement**: According to the geological conditions, pile foundation reinforcement or foundation treatment (such as replacement filling, grouting reinforcement, etc.) is used to enhance the bearing capacity and stability of the foundation.


3. **Safety measures during construction**
- **Construction equipment management**: The machinery, equipment, materials, etc. used should comply with national and industry standards to ensure the safety of the equipment.
- **Protection of construction personnel**: Construction personnel must wear personal protective equipment such as safety helmets and safety belts, and it is strictly forbidden to work under the influence of alcohol.
- **Lifting operation**: When lifting Bailey piers, they should be assembled in layers to avoid lifting a single set of Baileys to the top at one time, and ensure that the connection is firm before proceeding to the next step.
- **Scaffolding and protective facilities**: The erected scaffolding must be firm and reliable, and protective nets should be installed around and below to prevent people and objects from falling.
- **Electrical safety**: Temporary electricity use at the construction site should be strictly implemented in accordance with relevant specifications, use safe voltage, and ensure safe electricity use.


4. **Inspection and maintenance after construction**
- **Inspection and acceptance**: After the construction is completed, the connection of each part should be inspected and accepted to ensure the quality of construction.
- **Regular maintenance**: After the reinforcement is completed, the bridge should be inspected and maintained regularly to promptly discover and deal with potential safety hazards.

Through the above measures, construction safety can be effectively guaranteed during the reinforcement construction of Bailey bridges in mountainous areas, ensuring the stability and safety of the bridges.



Specifications:

CB200 Truss Press Limited Table
NO. Internal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS QS SSR DSR TSR QSR
200 Standard Truss Moment(kN.m) 1034.3 2027.2 2978.8 3930.3 2165.4 4244.2 6236.4 8228.6
200 Standard Truss Shear (kN) 222.1 435.3 639.6 843.9 222.1 435.3 639.6 843.9
201 High Bending Truss Moment(kN.m) 1593.2 3122.8 4585.5 6054.3 3335.8 6538.2 9607.1 12676.1
202 High Bending Truss Shear(kN) 348 696 1044 1392 348 696 1044 1392
203 Shear Force of Super High Shear Truss(kN) 509.8 999.2 1468.2 1937.2 509.8 999.2 1468.2 1937.2
Q235 Bailey Suspension Bridge / Prefabricated Compact Bailey BridgeQ235 Bailey Suspension Bridge / Prefabricated Compact Bailey BridgeQ235 Bailey Suspension Bridge / Prefabricated Compact Bailey BridgeQ235 Bailey Suspension Bridge / Prefabricated Compact Bailey Bridge

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
Structure Geometric Characteristics
Geometric Characteristics Chord Area(cm2) Section Properties(cm3) Moment of Inertia(cm4)
ss SS 25.48 5437 580174
SSR 50.96 10875 1160348
DS DS 50.96 10875 1160348
DSR1 76.44 16312 1740522
DSR2 101.92 21750 2320696
TS TS 76.44 16312 1740522
TSR2 127.4 27185 2900870
TSR3 152.88 32625 3481044
QS QS 101.92 21750 2320696
QSR3 178.36 38059 4061218
QSR4 203.84 43500 4641392
Q235 Bailey Suspension Bridge / Prefabricated Compact Bailey BridgeQ235 Bailey Suspension Bridge / Prefabricated Compact Bailey BridgeQ235 Bailey Suspension Bridge / Prefabricated Compact Bailey BridgeQ235 Bailey Suspension Bridge / Prefabricated Compact Bailey Bridge

​​

CB321(100) Truss Press Limited Table
No. Lnternal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Standard Truss Moment(kN.m) 788.2 1576.4 2246.4 3265.4 1687.5 3375 4809.4 6750
321(100) Standard Truss Shear (kN) 245.2 490.5 698.9 490.5 245.2 490.5 698.9 490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No. Geometric Characteristics Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Section properties(cm3) 3578.5 7157.1 10735.6 14817.9 7699.1 15398.3 23097.4 30641.7
321(100) Moment of inertia(cm4) 250497.2 500994.4 751491.6 2148588.8 577434.4 1154868.8 1732303.2 4596255.2
Q235 Bailey Suspension Bridge / Prefabricated Compact Bailey BridgeQ235 Bailey Suspension Bridge / Prefabricated Compact Bailey BridgeQ235 Bailey Suspension Bridge / Prefabricated Compact Bailey BridgeQ235 Bailey Suspension Bridge / Prefabricated Compact Bailey Bridge



Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity



Q235 Bailey Suspension Bridge / Prefabricated Compact Bailey Bridge


Product Tags:

q235 bailey suspension bridge

      

prefabricated compact bailey bridge

      

q235 compact bailey bridge

      
China Q235 Bailey Suspension Bridge / Prefabricated Compact Bailey Bridge wholesale

Q235 Bailey Suspension Bridge / Prefabricated Compact Bailey Bridge Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jiangsu Zhonghai Bridge Equipment Co.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)